Oak beams come from a sustainable source too, making them an attractive option for ethical builders. If they are British grown oak beams, used in British building projects, the transportation costs and carbon footprint are also good.

So no problems so far. The wooden internal walls are filled with insulation which means that the house is warmer and more comfortable to live in than a block house and certainly in the long run is much cheaper to run. And that means that sq ft for sq ft it has a much lower impact on the environment than a block house.

Hang your doors and install your windows. Hanging your doors is easy. You simply bolt your track and hardware in place. Then simply slide your doors rollers into the track. Install the end blocks and your done. Windows are easy to. All you need to do is cut the rough opening, frame with 2x6's and install your window in the frame. Then trim the windows with some 1x3 battens. The great thing about a post and beam barn is that you can put windows almost anywhere. No need to add headers, a timber frame home is self supporting. It doesn't rely on the walls for support.

Energy Star considers 25 percent air exchange per hour acceptable. The Wisconsin building code, and I find this amazing (and not in a good way), allows up to 50% of warm air to escape through leaks in the home every hour. This can cost the homeowner $500 to $600 annually! The Barton Designs home was found to lose only 3% and drops the lose in dollar amount to only $15 annually.

This is even more critical if you have a series of large windows on a long wall. Install the brackets on either end and run a string line to mark all the others. Remember a line can sag over a few metres so you may need to allow for that. Also check your height in a few places. If your floor had a hump in it, you would have to allow for that in your bracket height otherwise your curtains would drag on the floor in the middle. If this is the case you can raise your end brackets to compensate.

If you feel that you lack the essential skills then why not enroll on a part time course. Many community colleges provide courses in basic construction skills. You could combine your theory with some practice in your own back yard.

The rammed earth construction starts by setting out the wall area. The ground is cleared off all the top soil. A trench is excavated about one foot deep. A mass concrete foundation and a short foundation wall is laid. The wall is done one foot above the ground to hold the hardcore layer. A damp proof membrane is laid on the masonry foundation. Timber form work is fixed on both sides of the wall. A holder bat is nailed to stop the timber sides from widening.

So far we have talked about ways to tune your drum if it sounds flat and dull. What if you have the opposite problem? On a hot dry day the drum may sound very high pitched; in this case the best way to get the rawhide to loosen is by spraying or sprinkling small amounts of water on the rawhide.

timber framed, concrete floor, 20mm jamb thickness, numerous building